FIELD: agriculture. SUBSTANCE: in winter, when snow cover is 15-20 cm deep, strips of snow land are uncovered with forming snow walls along both sides of the bared strips. Next time the same procedure is repeated on the strips in 20-40 days, making double snow walls along the strips edges. In spring, when the snow begins to thaw, spring snow land uncover is exercised on the snow walls places. EFFECT: snow water melioration of the soil. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SHOW RECLAMATION | 0 |
|
SU1718746A1 |
METHOD FOR SNOW RECLAMATION | 0 |
|
SU1715218A1 |
METHOD FOR LAND RECLAMATION WITH SHOW | 0 |
|
SU1743389A1 |
METHOD OF SNOW RECLAMATION | 0 |
|
SU1605940A1 |
METHOD OF SNOW MELIORATION | 2019 |
|
RU2724137C1 |
METHOD FOR GROWING FIELD FOREST STRIPS | 0 |
|
SU1724092A1 |
METHOD FOR SNOWMELT CONTROL | 0 |
|
SU1724028A1 |
SOIL MOISTURE SUPPLY RETENTION METHOD | 1998 |
|
RU2137324C1 |
METHOD FOR RETENTION OF SOIL WATER SUPPLY | 1998 |
|
RU2137330C1 |
METHOD FOR APPLYING FERTILIZER UNDER SNOW COVER | 2001 |
|
RU2203525C2 |
Authors
Dates
1994-02-15—Published
1991-02-13—Filed