FIELD: hydraulic engineering. SUBSTANCE: territory of filled area 1 is divided into parallel strips 3. Provided on each boundary of adjacent strips from both opposite sides of filled area are catch pits, and pulp feed-lines with their alternating so that catch pit is provided against pulp feed-line. Filling is carried out in direction of catch pits 5, with sections of feed-line added in source of process. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR HYDRAULIC DEPOSITION OF SOIL FOR A HYDRAULIC STRUCTURE | 0 |
|
SU1671763A1 |
METHOD OF HYDRAULIC DEPOSITION OF EARTH STRUCTURE | 0 |
|
SU1585445A1 |
METHOD OF HYDRAULIC DEPOSITION OF STRUCTURES | 0 |
|
SU1335627A1 |
METHOD OF HYDRAULIC DEPOSITION OF NARROW-PROFILE STRUCTURE | 0 |
|
SU1498882A1 |
METHOD FOR WASHING UP SOIL | 0 |
|
SU1682442A1 |
METHOD OF HYDRAULIC DEPOSITION OF ARTIFICIAL SAND BEACH OF COHESIVE MATERIALS | 0 |
|
SU1393867A1 |
EARTH-FILL STRUCTURE | 0 |
|
SU1335628A1 |
METHOD OF ERECTING EARTH-FILL STRUCTURES | 0 |
|
SU933865A2 |
DEVICE FOR PURIFYING CONTAMINATED WATER IN RESERVOIR | 0 |
|
SU1525246A1 |
METHOD FOR HYDRAULICALLY DEPOSITING FILL STRUCTURES | 0 |
|
SU1656040A1 |
Authors
Dates
1994-03-30—Published
1991-06-18—Filed