FIELD: building. SUBSTANCE: joint has an end beam plate, column diaphragms positioned on the levels of upper and lower belts of the beam, and the flange of the upper beam belt. The joint has a strap fixed to a column shelf, the flange of the upper beam belt rests against the strap. The lower beam belt is fixed to the strap and the column shelf by bolts. EFFECT: improved structure. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
BEAM/I-BEAM COLUMN JOINT UNIT | 1992 |
|
RU2047707C1 |
JOINT OF I-BEAM SECTION COLUMN TO I-BEAM SECTION GIRDER | 0 |
|
SU1728408A1 |
JOINT BETWEEN CROSS-BAR AND COLUMN | 0 |
|
SU1686086A1 |
ROOF OF SILO TOWER | 1992 |
|
RU2017917C1 |
JOINT OF METAL BLIND WALL COMPONENT IN DOUBLE-T COLUMN | 0 |
|
SU1733587A1 |
RIGID JOINT BETWEEN GIRDER AND PILLAR | 0 |
|
SU1046439A1 |
JOINT OF I-SHAPED OF T-SHAPED BEAMS OF DOMICAL STRUCTURE | 2001 |
|
RU2183709C1 |
ASSEMBLY JOINT OF I-GIRDER AND COLUMN | 0 |
|
SU1073397A1 |
SOLID-WALL FRAME | 0 |
|
SU894128A1 |
TRANSVERSE FRAME OF SKELETON | 0 |
|
SU1530708A1 |
Authors
Dates
1994-04-15—Published
1992-03-09—Filed