FIELD: construction. SUBSTANCE: method includes orientation of structure member in horizontal plane before its transportation by crane to mounting zone. Orientation is carried out with the help of shield installed parallel to plane of front of constructed structure. Brought to structure base is grip in form of cross-piece with structure member so that cross-piece rollers press structure member to guide shield, and outer face of structure member relative to shield is installed at distance equalling minimal size of structure member. Structure member is fixed to cross-piece with additional safe-guard grips and transported by crane to mounting zone with simultaneous engagement of electromagnets. EFFECT: higher reliability in orientation of large-size structural members in their lifting to installation place, and reduced zone of hazard round erected structure. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
MANIPULATED CRANE FOR ERECTING BUILDINGS FROM PREFABRICATED REINFORCED CONCRETE | 0 |
|
SU1203011A1 |
METHOD OF ERECTING A STRUCTURE | 0 |
|
SU1337502A1 |
CRANE-MANIPULATOR | 0 |
|
SU1271817A1 |
FORMWORK FOR ERECTION OF MONOLITHIC REINFORCED CONCRETE STRUCTURES | 1991 |
|
RU2016992C1 |
CRANE-MANIPULATOR | 0 |
|
SU1355598A1 |
MOVABLE BARKING AGGREGATE | 1994 |
|
RU2078684C1 |
BUILDING CONSTRUCTION COMBINATION MACHINE | 0 |
|
SU972021A1 |
DEVICE FOR TURNING OVER A LINK OF RAILWAY GRID | 1991 |
|
RU2044812C1 |
FORMWORK PANEL | 1991 |
|
RU2016991C1 |
FACADE LIFT WITH VERTICAL AND HORIZONTAL MOVEMENT OF CRADLE | 2019 |
|
RU2724452C1 |