FIELD: gas and oil producing industry. SUBSTANCE: casing string is added with filter within the interval of producing formation. Filter holes are closed with acid-disintegrated plugs. Arranged in casing-borehole annulus against filter is grouting material in form of cement mortar with polyvinyl chloride in the amount of 10-20% of cement mass. After cement setting, polyvinyl chloride is subjected to thermal disintegration. EFFECT: increased efficiency of formation of permeable stone in filter zone, reduced material expenditures, and decreased corrosion of well equipment. 3 dwg, 1 tbl
| Title | Year | Author | Number |
|---|---|---|---|
| METHOD OF SECONDARY OPENING OF PRODUCING FORMATION | 1999 |
|
RU2163291C2 |
| METHOD FOR PUMPING IN HORIZONTAL WELLS | 1992 |
|
RU2061838C1 |
| METHOD OF SECONDARY OPENING UP OF PRODUCING FORMATION | 1999 |
|
RU2143057C1 |
| METHOD OF OPENING UP A PRODUCING FORMATION | 0 |
|
SU1615339A1 |
| METHOD FOR COMPLETION OF WELL | 0 |
|
SU1838589A3 |
| METHOD AT OPENING WORKING SEAM, FREE AT PERFORATING | 0 |
|
SU1765372A1 |
| DEVICE FOR COMPLETION OF WELL | 1994 |
|
RU2087684C1 |
| WELL OPERATION METHOD | 2007 |
|
RU2320854C1 |
| METHOD FOR PROCESSING BOTTOMHOLE FORMATION ZONE | 2017 |
|
RU2647136C1 |
| WELL COMPLETION METHOD | 1994 |
|
RU2083806C1 |
Authors
Dates
1994-09-15—Published
1991-12-09—Filed