FIELD: mining industry. SUBSTANCE: method includes driving of closed working over contour of wall of underground structure at its roof. One wall of working from inner side of structure is made square to floor, and the other, on the side of rock mass 5 at angle relative to horizontal plane. Working is divided by vertical forms 6 which are installed at distance equalling thickness of wall of underground structure measured from point of intersection of working inclined wall with its roof. Then, space behind forms is filled with cementing mortar 7. After its hardening, using the same procedure, underlying working is driven and filled with cementing mortar. Underlying working has roof width and side walls inclination equalling those of overlying working. EFFECT: higher efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTION OF CEILING OF UNDERGROUND STRUCTURE | 1990 |
|
RU2030586C1 |
METHOD FOR ERECTION OF WALL OF UNDERGROUND STRUCTURE | 1990 |
|
RU2021517C1 |
METHOD FOR PREVENTION OF ROCK INRUSH INTO UNDERGROUND WORKING | 0 |
|
SU1810554A1 |
METHOD FOR DETERMINATION OF DIRECTION OF DRIVING OF NONRECTILINEAR WORKINGS | 1990 |
|
RU2021516C1 |
METHOD FOR TESTING SHOTCRETED SUPPORT | 1991 |
|
RU2034154C1 |
METHOD FOR ERECTING MUCK DIKE | 0 |
|
SU977780A1 |
METHOD OF ERECTING SUPPORTING PILLAR | 0 |
|
SU1745940A1 |
METHOD OF DAMPING SHOCK WAVES IN MINE WORKING | 0 |
|
SU1435799A1 |
DEVICE FOR DAMPING ENERGY OF AIR SHOCK WAVES | 1990 |
|
RU2021530C1 |
METHOD OF FORMATION OF CUTTING HOLLOW AT SINKING OF MINING WORKINGS | 1991 |
|
RU2068958C1 |
Authors
Dates
1994-10-15—Published
1990-12-04—Filed