FIELD: mining. SUBSTANCE: blast stower has sluice chambers with charging and discharging ports and gates, charging chamber, air supply and transportation pipelines, metering device in form of metering vessels rigidly attached above charging ports and funnel hinged to above metering vessels by means of levers equal in length. Axles of hinged joints of levers are installed parallel to axis of pipeline. Distance between axles of hinge joints of levers with funnel is less than that between axles of hinge joints of levers with chamber body. Funnel with metering vessels is connected with air cylinders. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
PNEUMATIC STOWING MACHINE | 1992 |
|
RU2014473C1 |
CHAMBER FILLING-UP MACHINE | 0 |
|
SU1002610A2 |
CHAMBER CHARGING (FILLING) MACHINE | 0 |
|
SU1813184A3 |
VIBRATORY PNEUMATIC CHAMBER FILLING MACHINE | 0 |
|
SU1532720A1 |
PNEUMATIC FILLING-IN MACHINE | 0 |
|
SU945480A1 |
SET FOR FILLING-IN EXCAVATED SPACE | 0 |
|
SU806882A1 |
PNEUMATIC FILLING MACHINE | 0 |
|
SU826038A1 |
PNEUMATIC CHAMBER FILLING MACHINE | 0 |
|
SU1643739A1 |
VIBRATED PNEUMATIC CHAMBER-FILLING MACHINE | 0 |
|
SU1530799A1 |
CHAMBER-TYPE FILLING-UP MACHINE | 0 |
|
SU962662A1 |
Authors
Dates
1994-11-15—Published
1992-03-26—Filed