FIELD: mine and opencast hoisting plants provided with counterbalance in form of tanks. SUBSTANCE: method for static balancing of hoisting plant includes filling of water of metered amount into counterbalance tank and discharge of it in course of lowering in amount equalling the mass of rope connected to hoisting plant. Speed of water discharge is determined as sum of products of rope line mass of hoisting plant and counterbalance tank by their path covered per time unit. EFFECT: higher efficiency. 1 dwg