FIELD: testing chemical engines. SUBSTANCE: plant has several stages of ejectors coupled in series for transportation, cooling and mixing of exhaust and absorption solution. It is supplemented with closed basin of absorption solution, compressor for compression of exhaust, accumulating vessel, high pressure neutralizer with device to inject exhaust and counter-current tower connected in succession in direction of exhaust. Last stage of ejector is coupled by means of gas conduit to basin under level of absorption solution. Compressor is connected with inlet to gas cushion of basin and with outlet to device of injection of compressed exhaust of high-pressure neutralizer through accumulating vessel. Enhanced result was achieved thanks to improved heat-mass exchange of exhaust and of absorption solution in basin and of high pressure neutralizer. EFFECT: improved heat-mass exchange. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
LIQUID-PROPELLANT ROCKET ENGINE TEST METHOD | 1992 |
|
RU2050459C1 |
METHOD AND DEVICE FOR EVACUATION OF COMPRESSION CHAMBER DURING TESTS OF LIQUID LOW-THRUST ROCKET ENGINES IN MULTIPLE-START MODE | 1991 |
|
RU2011175C1 |
MOBILE SET FOR PUMPING OUT GAS FROM DISCONNECTED SECTION OF GAS MAINLINE (VERSIONS) | 1995 |
|
RU2108489C1 |
POWER PLANT OF UNDERWATER VEHICLE | 2013 |
|
RU2542166C1 |
INSTALLATION FOR PREPARATION OF HYDROGEN SULFIDE- CONTAINING OIL | 0 |
|
SU1794178A3 |
METHOD OF TREATING NATURAL GAS | 1998 |
|
RU2124929C1 |
METHOD OF LOW-POTENTIAL GAS RECOVERY | 2009 |
|
RU2396106C1 |
METHOD OF PREPARATION OF HYDROCARBON GAS FOR TRANSPORTATION | 1999 |
|
RU2171132C2 |
METHOD FOR PREPARING NATURAL GAS AT THE FINAL STAGE OF DEVELOPMENT OF A GAS CONDENSATE FIELD | 2021 |
|
RU2775239C1 |
PLANT AND METHOD OF CHEMICAL AGENT INJECTION INTO PIPELINE WITH HELP OF BLOWER | 2013 |
|
RU2532822C1 |
Authors
Dates
1995-03-20—Published
1992-04-16—Filed