FIELD: ferroconcrete base production. SUBSTANCE: in order to lower labor consumption of assembling and dismantling of forms and to provide effective change of manufacturing process for making new-type sleepers and beams of switch-over horizontal guides are rigidly secured to a protection grid of a tension apparatus along a lengthwise axis of the form. The horizontal guides have spring-loaded relative to the lengthwise axis of the form stoppers for fixing working position of void formers. A station for after-compaction of concrete mixture is provided by a portal to which a horizontal frame is suspended. The horizontal frame, being vertically moved, has horizontal guides, rigidly secured to it along its lengthwise axis, for movable spring-loaded stoppers, fixing working position of the void formers. In order to provide additional lowering of labor consumption at dismantling forms the spring-loaded stoppers for fixing working position of the void formers are provided by electromagnets in a station for compacting the concrete mixture. EFFECT: enhanced efficiency, lowered labor consumption. 2 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
CONVEYING DEVICE FOR PRODUCTION OF RAIL BASES | 1991 |
|
RU2008212C1 |
CONVEYER PLANT FOR PRODUCTION OF REINFORCED CONCRETE RAIL-BEARING BEDS | 0 |
|
SU1821373A1 |
REINFORCED CONCRETE BASEPLATE | 1990 |
|
RU2112097C1 |
ARRANGEMENT FOR MANUFACTURING FERROCONCRETE SLEEPERS | 0 |
|
SU1445977A1 |
HOLE-FORMING CORES FOR CONCRETE SLEEPER MOULDS | 0 |
|
SU1675098A1 |
METHOD OF TIE STACKING | 1990 |
|
RU2046088C1 |
INSTALLATION FOR MOULDING ARTICLES FROM CONCRETE MIXES | 0 |
|
SU1502346A1 |
ARRANGEMENT FOR REMOVING DIVIDING DIAPHRAGMS FROM MOLDS | 0 |
|
SU1740174A1 |
APPARATUS FOR MAKING FERROCONCRETE SLEEPERS | 0 |
|
SU1740173A1 |
FERROCONCRETE SLEEPER | 0 |
|
SU1541330A1 |
Authors
Dates
1995-03-27—Published
1991-10-04—Filed