FIELD: mining; construction of mine workings. SUBSTANCE: six blastholes are drilled to contour blasting cone of single blasthole charge. Charge is changed multiple to mass of one cartridge. Blasting of charges in short and long blastholes is initiated by electric detonators with delay indicated in invention description. EFFECT: higher efficiency. 4 cl, 6 dwg, 4 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PRODUCTION OF CUTTING CAVITY | 2008 |
|
RU2379623C1 |
METHOD OF FORMING A CUT-IN CAVITY | 0 |
|
SU804833A1 |
EXPLOSION CUT MAKING METHOD | 1992 |
|
RU2047760C1 |
METHOD AT MINE WORKING THROUGH BURST-DANGEROUS SEAMS AND ROCKS | 0 |
|
SU1765462A1 |
METHOD TO FORM KERF CAVITY | 1992 |
|
RU2047832C1 |
METHOD OF FORMATION OF CUTTING HOLLOW AT SINKING OF MINING WORKINGS | 1991 |
|
RU2068958C1 |
METHOD TO GENERATE CUTTER CAVITY | 1991 |
|
RU2029864C1 |
METHOD FOR DRIVING UNDERGROUND WORKING CLOSE TO OUTBURST-RISKY ROCK MASS | 1992 |
|
RU2094613C1 |
METHOD FOR FORMING KERF CAVITY | 1992 |
|
RU2047833C1 |
METHOD FOR DRIVING WORKING IN ROCKS CONTAINING OUTBURST-PRONE BED | 1992 |
|
RU2049237C1 |
Authors
Dates
1995-04-20—Published
1992-03-02—Filed