FIELD: mineral mining. SUBSTANCE: method includes drilling holes from working into direct and main floor towards worked face and in pillar through its entire width and simultaneous blasting of explosive charges in them after face is advanced from holes at distance of 6-8 m. Protective strip is left in working. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FIGHTING GROUND SWELLING IN DEVELOPMENT WORKINGS IN PILLARLESS WORKING OF STRATA | 0 |
|
SU1104289A1 |
ANCHOR | 1992 |
|
RU2029094C1 |
METHOD OF PREVENTING FLOOR HEAVING OF DEVELOPMENT WORKINGS | 0 |
|
SU1751348A1 |
METHOD OF GUARDING OF WORKINGS IN HEAVING SOILS | 1990 |
|
RU2007577C1 |
METHOD FOR MAINTENANCE OF FACE ENDS WITH PIT-BOTTOM WORKINGS IN READILY COLLAPSIBLE ROOF ZONES | 1992 |
|
RU2047764C1 |
METHOD FOR PROTECTION OF DEVELOPMENT WORKINGS USED REPEATEDLY IN COAL MINING | 0 |
|
SU1735583A1 |
CONTROL METHOD OF POORLY CAVING ROOF AT MINING OF GAS-BEARING FORMATIONS IN FACES WITH MECHANISED COMPLEXES | 2011 |
|
RU2472931C1 |
METHOD TO MANAGE HARD-TO-COLLAPSE ROOF WHEN MINING GAS-BEARING BEDS IN LONG FACES WITH MECHANICAL COMPLEXES | 2011 |
|
RU2471989C1 |
METHOD FOR PREVENTING ROCK GROUND IN WORKINGS FROM HEAVING | 1992 |
|
RU2074321C1 |
METHOD OF WORKING PROTECTION | 0 |
|
SU1710746A1 |
Authors
Dates
1995-04-30—Published
1992-04-28—Filed