FIELD: mining. SUBSTANCE: slot is formed in stoping chamber with the help of deep hole ring drilled from drilling working driven in interchamber pillar and designed for drilling and breakage of the latter. Serving as compensation space is undercutting of chambers formed in making pull holes. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTION OF STEEP-DROPPING AND SLANTING DEPOSITS OF LOWE AND AVERAGE MASSIVENESS | 2004 |
|
RU2254467C1 |
METHOD OF PREPARING BLOCK FOUNDATION | 0 |
|
SU1580010A1 |
METHOD FOR EXTRACTION OF STEEP-DROPPING DEPOSITS OF AVERAGE MASSIVENESS | 2004 |
|
RU2254473C1 |
METHOD FOR EXTRACTION OF STEEP-FALLING DEPOSITS OF AVERAGE MASSIVENESS | 2004 |
|
RU2254474C1 |
METHOD FOR EXTRACTION OF STEEP-FALLING AND SLANTING DEPOSITS OF LOW AND AVERAGE POWER | 2003 |
|
RU2247244C1 |
METHOD OF MINING THICK DEPOSITS OF HARD ORES | 0 |
|
SU1476137A1 |
METHOD OF MINING THICK STEEP ORE BODIES | 0 |
|
SU1580008A1 |
DEVELOPMENT METHOD OF THICK STEEPLY DIPPING ORE BODIES | 2012 |
|
RU2502872C1 |
METHOD FOR EXTRACTION OF THIN AND EXTREMELY THIN STEEP-FALLING AND SLANTING DEPOSITS | 2004 |
|
RU2255221C1 |
METHOD OF MINING ORE BODIES | 2023 |
|
RU2806387C1 |
Authors
Dates
1995-04-30—Published
1992-09-09—Filed