FIELD: mechanical engineering; transportation facilities. SUBSTANCE: device has drive 1 and chain conveyor with hangers secured on chains. Lower runs 4 and upper runs 3 of chains pass over charge-discharge section 5, painting section 6 and workpiece drying section 7. Arranged along lower run of conveyor chain are guides, pressure sprockets 12, 13 and 14 and toothed rack. Fitted on charge-discharge section 5 for engagement with chain links is spring-loaded stop. Each hanger of chain conveyer is made in form of rotating detachable drum with detents and gear wheel. Detents are secured on drum generatrix. Gear wheel is installed on one of drum end faces for engagement with toothed rack. Each detachable drum is installed in chain links by means of pins. One of pins is spring-loaded. Detents are made in form of flat resilient members. Pins of charged drum get into bushings of moving chain. In process of workpiece painting and drying gear wheel of drum moves along toothed rack, drum rotates and quality of treatment of workpieces is improved. EFFECT: enhanced quality of treatment. 8 dwg
Title | Year | Author | Number |
---|---|---|---|
STEP LAYING MECHANISM WITH REMOTE CONTROL | 1990 |
|
RU2036409C1 |
PARTS WASHING AND DRYING INSTALLATION | 1991 |
|
RU2006523C1 |
UNIT FOR ELECTROCHEMICAL TREATMENT | 1991 |
|
RU2015208C1 |
DEVICE FOR DISPLACING LOAD-BEARING FACILITY FROM LOAD PLATFORM OF HOIST TO LOAD/UNLOADING PLATFORM | 1999 |
|
RU2152340C1 |
INSTALLATION FOR APPLYING THE COATING ON ARTICLES BY DIPPING | 0 |
|
SU1178501A1 |
ARTICLE-PAINTING PLANT | 0 |
|
SU651854A1 |
TRANSPORTING ARRANGEMENT OF A ROTARY-CONVEYER MACHINE | 0 |
|
SU1074777A1 |
APPARATUS FOR PROVING DOUGH BLANKS | 0 |
|
SU1136782A1 |
SHELF BELT ELEVATOR | 2009 |
|
RU2406672C1 |
TELESCOPIC BELT CONVEYER | 0 |
|
SU745796A1 |
Authors
Dates
1995-05-10—Published
1990-06-11—Filed