FIELD: mining, forming artificial deposits. SUBSTANCE: first drain layer is formed, then layer on the base of gold-bearing pyrites with hole-type conductance being beneficiated, then layer of gold bearing rock being leached are formed. Solutions of source 4 are used to treat dump surface. EFFECT: gold recovery. 1 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| METHOD OF INTRADUMP CONCENTRATION OF GOLD-CONTAINING SUBSTANDARD ORES | 1994 |
|
RU2087715C1 |
| METHOD FOR INTRADUMP CONCENTRATION OF GOLD-CONTAINING ROCKS | 1991 |
|
RU2042819C1 |
| METHOD OF SELECTIVE IN-DUMP BENEFICATION OF ORES | 1992 |
|
RU2085740C1 |
| METHOD FOR GEOCHEMICAL ORE TREATMENT OF SUBSTANDARD, REBELLIOUS ORES | 1992 |
|
RU2061866C1 |
| METHOD FOR INTER DUMP BENEFICIATION OF SUBSTANDARD BISMUTH- BEARING ORES | 1992 |
|
RU2066759C1 |
| METHOD FOR SELECTIVE ROCK CONCENTRATION WITHIN PILE | 1992 |
|
RU2065048C1 |
| METHOD FOR SELECTIVE IN-DUMP BENEFICATION OF REJECTED ORES AND NON-METAL ROCKS | 1992 |
|
RU2094493C1 |
| METHOD FOR SELECTIVE INTERNAL DUMP BENEFICIATION OF SUBSTANDARD ORES | 1992 |
|
RU2062878C1 |
| METHOD FOR SELECTIVE IN-DUMP METAL-BEARING ROCK DRESSING | 1991 |
|
RU2013551C1 |
| METHOD FOR SELECTIVE INTRADUMP CONCENTRATION OF ROCKS | 1992 |
|
RU2042820C1 |
Authors
Dates
1996-06-27—Published
1991-06-04—Filed