FIELD: oil production industry. SUBSTANCE: method for development of oil pool includes detection in producing interval of separate interlayers of layers different in coefficient of absolute permeability, and they are opened by perforation with different perforation density depending on the reservoir properties of detected intervals. Perforation density is determined by the relation given in the invention description. Then, well is completed and products are withdrawn. EFFECT: higher efficiency. 2 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF STICKY OIL AND BITUMEN ACCUMULATION | 2013 |
|
RU2513484C1 |
MULTI ZONE OIL RESERVOIR AT LATE STAGE WITH UNSTABLE COVER FORMATION AND NON-HOMOGENEOUS COLLECTOR DEVELOPMENT METHOD | 2008 |
|
RU2382183C1 |
DEVELOPMENT METHOD OF OIL DEPOSIT WITH HORIZONTAL WELLS | 2013 |
|
RU2527429C1 |
METHOD OF ACID TREATMENT OF OIL RESERVOIR | 2014 |
|
RU2551612C1 |
METHOD FOR OIL PRODUCTION AT THE LATER STAGE OF OIL DEPOSIT HAVING WATER BED DEVELOPMENT | 2005 |
|
RU2299977C2 |
METHOD OF DEVELOPMENT BY MULTIPLE HYDRAULIC FRACTURING OF OIL DEPOSIT WITH LOW PERMEABILITY | 2014 |
|
RU2549942C1 |
LARGE-VOLUME ACID TREATMENT METHOD FOR CARBONATE BED | 2013 |
|
RU2533393C1 |
METHOD FOR DEVELOPMENT OF INCLINED BURIED MINERAL PRODUCING FORMATION | 2015 |
|
RU2593849C1 |
PRODUCTIVE DEPOSIT DEVELOPMENT METHOD | 2012 |
|
RU2509877C1 |
METHOD OF BITUMEN DEPOSIT DEVELOPMENT WITH HORIZONTAL WELLS WITH DISTRIBUTED PERFORATION | 2019 |
|
RU2713023C1 |
Authors
Dates
1996-09-20—Published
1992-03-06—Filed