FIELD: oil industry. SUBSTANCE: method implies drilling of production and pumping-in boreholes, exposing of stratum in production boreholes in its bottom part and in pumping-in boreholes in its top part. Oil production is effected with simultaneous checking of stratum pressure until this pressure is reduced down to 5-6 MPa with subsequent cyclic pumping-in of acidic solution of increasing concentration. EFFECT: high efficiency. 3 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPING OIL DEPOSIT IN CARBONATE RESERVOIRS OF FISSURED TYPE | 1996 |
|
RU2101474C1 |
METHOD OF DEVELOPMENT OF OIL POOL HAVING RESERVOIR PITCHING-OUT ZONES | 1994 |
|
RU2090743C1 |
METHOD FOR DEVELOPMENT OF OIL FORMATION | 1992 |
|
RU2070282C1 |
METHOD FOR DEVELOPMENT OF HETEROGENEOUS FORMATIONS | 1989 |
|
SU1600426A1 |
METHOD OF EXTRACTING RESIDUAL OIL | 1993 |
|
RU2065940C1 |
METHOD FOR FLOODING OIL DEPOSIT | 1994 |
|
RU2072032C1 |
METHOD FOR DEVELOPING FLOODED OIL DEPOSITS WITH STRATA OF DIFFERENT PENETRABILITY AND NONUNIFORM IN DIFFERENT ZONES | 1992 |
|
RU2046182C1 |
METHOD FOR DEVELOPMENT OF WATER-OIL BED | 1998 |
|
RU2146760C1 |
OIL PRODUCTION METHOD | 1995 |
|
RU2086757C1 |
METHOD OF DISPLACING OIL FROM LENS | 1993 |
|
RU2065942C1 |
Authors
Dates
1997-02-20—Published
1992-04-02—Filed