FIELD: oil and gas well drilling and abandoning. SUBSTANCE: cement bridge is installed in casing string over the productive horizon. Then in-casing space gets open to its casing string borehole annulus within the range of high ductile rocks with standby borehole available. Then additional cement bridge is installed so as its roof be adequate to lower boundary of the interval of the highly ductile rocks. Then flowing of the highly ductile rocks to the in-case space by installing hydrostatic pressure (P, MPa) on condition that: , where ρav. is mean weighted density of rocks, gram per cubic centimeter; H is the depth of interval foot of the highly ductile rocks; ρf is equivalent yield strength of the highly ductile rock, MPa. EFFECT: higher reliability in abandoning wells.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ISOLATION OF GAS-OIL WATER INFLOW ZONES | 1994 |
|
RU2074948C1 |
METHOD OF ABANDONMENT OF WELL WITH SOURCE OF ANNULAR SPACE PRESSURE | 1998 |
|
RU2168607C2 |
WELL KILLING METHOD | 2004 |
|
RU2283942C2 |
METHODS OF ISOLATION OF THE PRODUCTIVE STRATA OVERLAPPED BY THE CASING STRINGS AND THE GROUTING MORTAR FOR ITS EXERCISE | 2005 |
|
RU2299230C2 |
METHOD OF SHUTOFF OF WATER INFLOW OVER CEMENTING ANNULAR SPACE IN OPERATION OF OIL AND GAS WELLS | 2000 |
|
RU2196878C2 |
ELIMINATION METHOD OF WELLS | 2018 |
|
RU2693623C1 |
METHOD OF WELL ABANDONMENT | 2013 |
|
RU2527446C1 |
METHOD OF WELL ABANDONMENT | 2013 |
|
RU2531965C1 |
METHOD OF WELL ABANDONMENT | 2013 |
|
RU2534309C1 |
METHOD FOR WELL CASING IN FLOW ROCKS | 1993 |
|
RU2066735C1 |
Authors
Dates
1997-02-27—Published
1994-07-04—Filed