FIELD: drainage for land reclamation, deep water supply, construction of basins. SUBSTANCE: method implies constructing several drain wells with filter columns, creation a through channel in earth from them section by section, introduction of water collection pipeline into channel from its end face with passing through filter columns, creation of openings inside columns in water collection pipeline. If necessary, drilled between drain wells are additional bore-holes down to depth of water collection pipeline, and sections of through channel are formed from them. In loose and non-cohesive ground, channel section are formed by washing-out of ground by streams of liquid in gas flow. EFFECT: high efficiency. 3 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TRENCHLESS LAYING OF PIPE LINES ON SOIL | 1997 |
|
RU2139465C1 |
UNWATERING COLLECTOR DRAINAGE | 2001 |
|
RU2222667C2 |
HYDRAULIC-MINE DUMP OF INDUSTRIAL WASTE | 2003 |
|
RU2252295C2 |
METHOD FOR CONSTRUCTION OF CLOSED HORIZONTAL DRAINAGE IN IRRIGATED FIELD | 0 |
|
SU1678966A1 |
INDUSTRIAL SLURRY DUMP | 2005 |
|
RU2293159C1 |
SEWAGE WATER TREATMENT WORKS | 1992 |
|
RU2062634C1 |
METHOD OF ARRANGING DRAINAGE-HUMIDIFICATION SYSTEM UNDER CONDITIONS OF USING WATERING BY SPRINKLING INSTALLATION WITH LIVESTOCK SEWAGE | 2016 |
|
RU2618091C1 |
CULVERT FOR PROTECTION OF ROADS FROM LAND RUNOFF AND SEDIMENTS | 2017 |
|
RU2659438C1 |
ARRANGEMENT METHOD OF DRYING SYSTEM WITH NARROW ENCLOSURE PLOUGHING OF DRAINED SOILS | 2009 |
|
RU2393293C1 |
TOE BASIN OF SPILLWAY STRUCTURE | 2000 |
|
RU2195529C2 |
Authors
Dates
1997-03-10—Published
1994-09-27—Filed