FIELD: metallurgy. SUBSTANCE: plant contains hermetic steam chamber, water- supply and steam-withdrawing collectors, and containers for molten slag. Slag granulation bunker is constructed in the form of hollow water-cooled shaft with blades. The latter are hollow prisms and conical shells. Great bases of blades are docked to each other. Smaller bases are coupled with shaft and form cavities surrounding shaft. One of end cavities is connected with steam-withdrawing collector and the other gh4 shaft hollow with hermetic steam chamber. Shells have cuts with angular displacement. EFFECT: improved construction. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
FURNACE FOR MELTING NON-FERROUS METALS AND ALLOYS | 1993 |
|
RU2061941C1 |
DEVICE FOR RAMMING LINING | 1993 |
|
RU2089807C1 |
BOILER AND PELLETIZER | 0 |
|
SU948929A1 |
APPARATUS FOR GRANULATING METALLURGICAL MELT | 0 |
|
SU979287A1 |
SEALED APPARATUS | 1991 |
|
RU2006276C1 |
DEVICE FOR PRODUCING STEAM IN GRANULATION OF METALLURGICAL SLAGS | 0 |
|
SU1263663A1 |
GEAR TESTING SAMPLES FOR CRACK RESISTANCE | 1993 |
|
RU2069341C1 |
METHOD FOR HARDENING OF BULKY ARTICLES OF COMPLICATED CONFIGURATION | 1996 |
|
RU2105823C1 |
DIE FOR MOULDING VANE | 1995 |
|
RU2080234C1 |
APPARATUS FOR PELLETIZING SLAG MELT | 0 |
|
SU925893A1 |
Authors
Dates
1997-09-27—Published
1993-06-16—Filed