FIELD: mining industry. SUBSTANCE: this can be in development of kimberlite pipes. According to method, productive horizon is opened by hydraulic producing well and mining is performed layer-by-layer in downward succession. Rock of layer is treated by solution of reagent with solving of cementing calcite and releasing of gas which is utilized for displacing used reagent solution through slurry-discharge pipe string. Then, loosened layer is washed out by pressure-forced stream. In addition, compressed air can be injected into well for displacing used solution. EFFECT: high efficiency. 1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE FOR HYDRAULIC MINING OF MINERALS FROM PLACER DEPOSITS IN PERMAFROST | 1996 |
|
RU2095572C1 |
METHOD FOR UNDERGROUND HYDRO MINING OF MINERALS AND THE DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2763162C1 |
METHOD OF RECOVERING MATERIALS FROM PRODUCING LAYERS | 0 |
|
SU1293344A1 |
METHOD FOR WELL HYDRO-EXTRACTION OF MINERAL RESOURCES | 2005 |
|
RU2301336C2 |
METHOD FOR HYDRAULIC BOREHOLE MINING | 2016 |
|
RU2635928C1 |
METHOD OF HYDRAULIC RECOVERY THROUGH WELLS FROM THICK UNDERGROUND FORMATIONS | 0 |
|
SU1294992A1 |
METHOD FOR MINING DIAMOND-CARRYING KIMBERLITE PIPES | 1994 |
|
RU2081321C1 |
DEEP-WELL HYDRAULIC MONITOR UNIT | 0 |
|
SU1317131A1 |
METHOD TO EXTRACT MATERIALS FROM THICK UNDERGROUND FORMATIONS | 2010 |
|
RU2447287C1 |
HYDRAULIC BORE MINING OF MINERALS | 2016 |
|
RU2640611C2 |
Authors
Dates
1997-11-10—Published
1996-12-09—Filed