FIELD: construction. SUBSTANCE: in manufacture of box-type reinforced-concrete articles, reinforcing cage is installed on lower casing panel after closing of external casing panels which are hinged to lower panel, then article bottom is concreted with compaction of concrete mix by vibration force pulses for 30-240 s and holding for 2-12 h, then core is installed and box vertical walls are concreted. Vibrocompaction of concrete mix of vertical walls is accomplished by internal vibrators in course of mix supply to gap between panels and core. Vibrocompaction by internal vibrators is combined in time with periodic engagement of parallel single-shaft vibrators of lower casing panel for 5-30 s with an interval of 60-200 s. Core is made with posts which are centered on lower casing panel with the help of pivots embracing guide pins of truncated cones of lower panel. Height of truncated cones equals to thickness of bottom of manufactured box. EFFECT: higher efficiency. 3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
PLANT FOR MOULDING THREE-DIMENSIONAL ELEMENTS | 0 |
|
SU863361A1 |
UNIT FOR MAKING PRESTRESSED FERROCONCRETE THREE-DIMENSIONAL MEMBERS | 0 |
|
SU710804A1 |
METHOD AND FRAMEWORK FOR MANUFACTURING PIPES FROM POLYMER-IMPREGNATED CONCRETE | 1995 |
|
RU2091220C1 |
METHOD OF MANUFACTURING SOLID VOLUMETRIC BLOCKS | 0 |
|
SU1735542A1 |
ARRANGEMENT FOR MOULDING THREE-DIMENSIONAL BLOCKS | 0 |
|
SU743875A1 |
FLOOR CONSTRUCTION METHOD | 0 |
|
SU1002488A1 |
ARRANGEMENT FOR MANUFACTURING THREE-DIMENIONAL MEMBERS | 0 |
|
SU1303412A1 |
ARRANGEMENT FOR ERECTING FERROCONCRETE SOLID COLUMNS | 0 |
|
SU1294962A1 |
LINE FOR PRODUCING LONG CONSTRUCTION ARTICLES | 2005 |
|
RU2292262C1 |
INSTALLATION FOR MAKING SPATIAL ELEMENTS | 0 |
|
SU1206099A1 |
Authors
Dates
1997-12-20—Published
1997-02-05—Filed