FIELD: mining industry. SUBSTANCE: the offered method includes drilling-in of producing bed in each mined panel by holes, installation in each hole of pulp lifting string, washing-out of producing bed by borehole hydraulic giant with formation of production rooms, lifting of pulp to the surface, and filling of worked-out space of each extracted room. Panels are worked in two stages by rooms cylindrical in shape. Worked-out space of room in panels of the first stage is filled with cementing fill. Panels of the second stage are worked between panels of the first stage by sections consisting of, at least, two simultaneously worked rooms. Before working of the next section, separating pillar is formed on the boundary with mineral mass by leading extraction and filling of worked-out space of single room with cementing fill. EFFECT: higher efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING OF MINERAL DEPOSITS | 1996 |
|
RU2101503C1 |
METHOD OF BORE-HOLE HYDRAULIC MINING OF MINERALS | 1995 |
|
RU2081325C1 |
PROCESS OF HYDRAULIC MINING OF SOLID MINERAL RESOURCES THROUGH HOLES | 2001 |
|
RU2181160C1 |
METHOD FOR BORE-HOLE EXTRACTION OF USEFUL MINERALS | 1995 |
|
RU2086768C1 |
PROCESS OF BOREHOLE HYDRAULICKING OF MINERALS AND AGGREGATE FOR ITS IMPLEMENTATION | 1997 |
|
RU2109949C1 |
METHOD OF MINERAL HYDRAULIC BOREHOLE MINING | 1996 |
|
RU2101506C1 |
METHOD OF BORE-HOLE HYDRAULIC MINING OF MINERALS IN MASSIVE DEPOSITS | 1995 |
|
RU2081326C1 |
METHOD OF BOREHOLE HYDROMINING | 0 |
|
SU1654578A1 |
METHOD OF WINNING MINERALS THROUGH HYDRAULIC WELLS | 0 |
|
SU1521874A1 |
METHOD FOR HYDRAULIC BORE-HOLE MINING OF MINERALS | 1995 |
|
RU2081324C1 |
Authors
Dates
1998-01-10—Published
1996-09-30—Filed