FIELD: oil production industry. SUBSTANCE: this can be used in oil wells during repair operations. Method ensures creation of efficient and simple to realize technological procedure which allows for reduction of oil bed permeability in water flooded interval, and to exclude operation of preliminary stopping of wells with abnormally high bed pressure, it also widens range of materials to be used for repair and isolation activities. According to method, injected into well are two reagents which interact with subsequent creation of sediment insoluble in water. EFFECT: higher efficiency. 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TREATMENT OF WATERED DOWN-HOLE ZONE OF PRODUCING WELL | 1996 |
|
RU2094603C1 |
METHOD FOR ISOLATION OF BRINE WATER INFLOW | 1996 |
|
RU2114991C1 |
METHOD FOR INCREASED EMBRACING OF NONUNIFORM BEDS BY FLOODING | 1997 |
|
RU2114288C1 |
METHOD FOR REGULATING DEVELOPMENT OF OIL DEPOSITS | 1995 |
|
RU2096601C1 |
METHOD OF DEVELOPING NONUNIFORM OIL POOL | 1995 |
|
RU2065936C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1996 |
|
RU2103490C1 |
METHOD FOR ISOLATION OF ABSORPTION ZONE IN WELLS | 1998 |
|
RU2139410C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1996 |
|
RU2117143C1 |
WELL KILLING FOAMING COMPOSITION | 2004 |
|
RU2266394C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS | 1997 |
|
RU2127802C1 |
Authors
Dates
1998-04-10—Published
1995-08-15—Filed