FIELD: gas producing industry. SUBSTANCE: this can be used for selection of optimal productive capacity of wells drilled in gas-bearing wells in development of gas-condensate deposits. According to method, wells are subjected to testing. Measured during this testing are bed pressure Pb and bottom-hole pressure Pb-h in well. Testing of wells is started at minimal possible output with gradually increasing it. Inflow of gas to bottom hole of well is calculated according to mathematical formula which is brought forth in description of invention. This formula takes into account following parameters: permeability factor, gas-yielding depth of bed, bed and standard temperature, coefficient of compressibility in bed conditions and in standard conditions, dynamic viscosity of gas in bed conditions, pressure at standard conditions, radius of feed contour, and radius of well. Power-conserving output is also calculated according to given condition with taking account of well output, unitary function which is equal to 0 at Q ≤ Q0 and equal to 1 at Q > Q0, also taking account of factor characterizing geometry of porous passages and density of gas at standard conditions. EFFECT: higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF GAS AND GAS-CONDENSATE DEPOSITS | 1998 |
|
RU2124628C1 |
METHOD FOR DETERMINING MINIMAL OUTPUT ENSURING DELIVERY OF BED FLUID FROM BOTTOM HOLE OF GAS WELLS AND GAS-CONDENSATE WELLS | 1998 |
|
RU2124635C1 |
METHOD FOR DETERMINING LOWER BOUNDARY OF OCCURRENCE OF PERMAFROST GROUND | 1998 |
|
RU2125149C1 |
METHOD FOR DEVELOPMENT OF MULTIDOME GAS AND/OR GAS-CONDENSATE-OIL DEPOSITS | 1999 |
|
RU2146758C1 |
METHOD DETERMINING CONDITION OF FACE ZONE OF GAS WELL | 1998 |
|
RU2151869C1 |
METHOD FOR STUDY OF PRODUCING FORMATION IN NATURAL PRESSURE GAS-LIFT WELL OPERATION | 1993 |
|
RU2067171C1 |
METHOD FOR DRILLING-IN AT CONTROLLED DRAWDOWN | 2017 |
|
RU2649204C1 |
METHOD FOR STUDYING GAS WELLS WITH STATIONARY MODES OF FILTRATION | 1992 |
|
RU2067663C1 |
DEVICE FOR IMPROVING RELIABILITY IN OPERATION AND REPAIR OF WELLS | 1999 |
|
RU2146755C1 |
METHOD OF DIFFERENTIATED DETERMINATION OF FILTRATION PARAMETERS OF JOINTLY OPERATED PRODUCING FORMATIONS | 1999 |
|
RU2172404C2 |
Authors
Dates
1999-01-20—Published
1998-06-11—Filed