FIELD: low- and medium-capacity boilers. SUBSTANCE: boiler has top and bottom drums communicating through convective-bank uptake and downcoming tubes 3 and 4, respectively, where tube-to-tube clearances form at least one separate gas conduit. Furnace 5 abutting against convective bank tubes is surrounded by waterwalls connected to respective headers joined with boiler drums. Boiler also has two-stage economizer communicating with its water space; economizer stages 13 and 14 are connected in series with convective bank tubes inserted in boiler natural circulation loop along heating-gas flow and their counterflow gas channels are connected to supply main. EFFECT: provision for augmenting thermal processes in convective heating surfaces. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
FORCED-CIRCULATION BOILER | 1998 |
|
RU2157483C2 |
WATER-TUBE BOILER | 1997 |
|
RU2122677C1 |
HOT-WATER BOILER | 2000 |
|
RU2188361C2 |
WATER BOILER | 2001 |
|
RU2213307C2 |
ENERGO-TECHNOLOGICAL BOILER FOR COMBUSTION OF HYDROGEN SULPHIDE (VERSIONS) | 2010 |
|
RU2431776C1 |
BOILER PLANT WITH A CYLINDRICAL BOILER AND A WATER-HEATER, A WATER-TUBE COUNTERCURRENT CYLINDRICAL BOILER WITH A CONVECTIVE BEAM, A RING-SHAPED SECTIONAL FINNED COLLECTOR | 2002 |
|
RU2249761C2 |
VERTICAL HOT-WATER BOILER | 2001 |
|
RU2194925C2 |
STEAM WATER TUBE BOILER WITH NATURAL CIRCULATION | 2016 |
|
RU2634985C1 |
HOT WATER BOILER | 2006 |
|
RU2341732C2 |
HOT-WATER BOILER | 1999 |
|
RU2164324C2 |
Authors
Dates
1999-05-27—Published
1997-11-05—Filed