FIELD: oil and gas production industry. SUBSTANCE: according to method, removed asphalt-resin and paraffin depositions are dispersed in oil field equipment. Method implies delivery of inhibitor into annular space in amount of 0.5-20 mas.% of volume of oil contained in product being pumped out and located in internal space of pump-compressor pipes and in annular space within limits from dynamic level to pump inlet. Operation of immersed pump is performed in closed circuit system consisting of pumping pipes and discharge line. Pumped-out product together with reagent circulates through closed circuit system. Application of aforesaid method improves efficiency of inhibiting asphalt-resin and paraffin depositions together with increasing amount of product recovered. EFFECT: higher efficiency. 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PROTECTING OF WELL EQUIPMENT AND WELL DISCHARGE LINE | 1999 |
|
RU2170287C2 |
METHOD OF REMOVING PARAFFIN DEPOSITS | 2015 |
|
RU2584172C1 |
METHOD OF REMOVING DEPOSITS FROM WELL EQUIPPED WITH BOTTOM-HOLE PUMP | 2016 |
|
RU2603866C1 |
METHOD FOR WELL CLEANING OF ASPHALT-TAR-PARAFFIN AND SULFIDE DEPOSITS | 2004 |
|
RU2266392C2 |
METHOD FOR PREVENTING DEPOSITS OF ASPHALT-RESINS AND PARAFFIN COMPONENTS OF OIL IN PUMP COMPRESSOR TUBES IN THE WELL AND DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2661951C1 |
WELL SUCKER-ROD PUMP DRIVE | 1998 |
|
RU2133875C1 |
METHOD OF DEVELOPING NONUNIFORM OIL FORMATION | 1998 |
|
RU2167278C2 |
METHOD OF PREVENTING FORMATION OF ASPHALT-RESINOUS AND PARAFFIN ACCUMULATIONS IN SYSTEM OF OIL PRODUCTION AND GATHERING | 2000 |
|
RU2176310C2 |
METHOD OF DEVELOPING OIL DEPOSIT | 1997 |
|
RU2168617C2 |
METHOD OF ADDITIONALLY DISPLACING RESIDUAL OIL | 1997 |
|
RU2134342C1 |
Authors
Dates
1999-06-27—Published
1997-04-09—Filed