FIELD: bridge-building technology. SUBSTANCE: joining device can be used in span structures of bridges for combining sectional reinforced concrete slab of carriage way with metal structure of bridge. Device has components embedded in reinforced concrete slab. Embedded components has openings which are coaxial with holes made in main girder of bridge for high-strength bolts which ensure joining of slab with girder. Embedded components secured in slab by means of anchors are made in the form of steel sleeves with bottom which is kept in contact with upper girth of main girder of bridge in which openings are provided for high-strength bolts. Structurally, sleeve can take the form of pipe and sheet combined together by means of welding. Aforesaid embodiment of device improves reliability of joining, affords good repairability, reduced amount of materials needed for construction, and less labour-intensity. EFFECT: higher efficiency. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
COUPLING DEVICE OF BUILT-UP REINFORCED-CONCRETE SLAB WITH STEEL BEAM OF STEEL REINFORCED-CONCRETE BRIDGE | 2001 |
|
RU2184187C1 |
METHOD FOR COMPOSITE REINFORCED CONCRETE BRIDGE SPAN STRUCTURE CONSTRUCTION AND COMPOSITE REINFORCED CONCRETE MEMBER FOR SPAN STRUCTURE CONSTRUCTION | 2005 |
|
RU2279503C1 |
BUTT JOINT OF MONOLITHIC REINFORCED CONCRETE SLAB AND STEEL GIRDER OF STEEL-REINFORCED CONCRETE BRIDGE SPAN STRUCTURE | 1997 |
|
RU2110639C1 |
STEEL AND REINFORCED CONCRETE SPAN STRUCTURE OF BRIDGE | 0 |
|
SU926146A1 |
STEEL REINFORCED CONCRETE BRIDGE SPAN | 0 |
|
SU642408A1 |
COMPOSITE BRIDGE SPAN STRUCTURE AND METHOD OF ITS PRODUCTION | 2003 |
|
RU2246573C1 |
MOVEMENT JOINT OF BRIDGE ROADWAY | 1999 |
|
RU2166021C1 |
COMPOSITE REINFORCED CONCRETE BRIDGE SPAN | 2013 |
|
RU2546210C1 |
BRIDGE SPAN STRUCTURE | 0 |
|
SU700584A1 |
STEEL AND CONCRETE BRIDGE SPAN | 2015 |
|
RU2609504C1 |
Authors
Dates
1999-07-27—Published
1997-11-28—Filed