FIELD: ship raising. SUBSTANCE: markers are placed in pairs on ship on single rope movably connected with shackle, then marker rope is heaved in and its section is spliced to rated load-bearing rope; ends of load-bearing rope are passed to different sides of surface ship and are connected with winches of anchors, after which raising the ship is started and is continued to keel of surface ship; thus raised is transported in such position to port. Raising the ship may be performed by standard cargo vessel which maintains stability taking into account loading of this vessel and loading of sunken ship. EFFECT: enhanced efficiency and reliability.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RAISING SHIP FROM BOTTOM SOIL | 1997 |
|
RU2135389C1 |
METHOD OF RAISING SHIP FROM BOTTOM GROUND | 1999 |
|
RU2151080C1 |
METHOD OF RAISING SHIP FROM BOTTOM OF WATER BASIN | 1997 |
|
RU2139223C1 |
METHOD OF RAISING SHIP FROM BOTTOM AND TRANSPORTATION OF RAISED SHIP | 1997 |
|
RU2134210C1 |
COMPLEX FOR RAISING SHIP FROM BOTTOM OF WATER BASIN | 1997 |
|
RU2128599C1 |
METHOD OF RAISING SHIP FROM WATER BASIN BOTTOM | 1999 |
|
RU2151079C1 |
METHOD OF RAISING SHIP FROM WATER BASIN BOTTOM | 1997 |
|
RU2135388C1 |
METHOD OF RESCUE OF SHIP AND HER CREW | 1997 |
|
RU2128125C1 |
METHOD OF RESCUE OF SHIP | 1997 |
|
RU2127691C1 |
METHOD OF RAISING SHIP FROM BOTTOM TO WATER SURFACE | 1997 |
|
RU2134646C1 |
Authors
Dates
1999-08-10—Published
1997-12-22—Filed