FIELD: reconnaissance of oil and gas deposits. SUBSTANCE: method involves field geophysical measurements, including seismic reconnaissance, gravitation and magnetic field measurements and drilling. Function between geophysical data and real data of structural shape of reflecting line is achieved by complex interpretation and structural drilling. Optimal decision is checked by regression or mean square discrepancy. EFFECT: increased reliability of estimations, decreased costs. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD PREDICTING STRUCTURE PLAN OF DEEPLY IMMERSED SEPARATION BOUNDARIES OF SEDIMENTARY MANTLE | 2002 |
|
RU2207602C1 |
METHOD FOR CONSTRUCTION OF WELLS | 1996 |
|
RU2109909C1 |
FLOW SAFETY VALVE OF FORMATION TESTER | 1998 |
|
RU2147674C1 |
PACKER | 1996 |
|
RU2112862C1 |
METHOD FOR TENSIONING OF CASING STRINGS | 1998 |
|
RU2132923C1 |
METHOD OF OPERATION OF OIL-GAS WELLS | 1998 |
|
RU2158361C2 |
PACKER | 1996 |
|
RU2105863C1 |
TWO-POSITION NON-RETURN VALVE | 1994 |
|
RU2133900C1 |
GEAR CLEANING FILTRATION TUBES OF WATER INTAKE WELLS | 1996 |
|
RU2112111C1 |
METHOD FOR STABILIZATION OF WASHING-AWAY BANKS OF TUNDRA RIVERS | 1999 |
|
RU2149947C1 |
Authors
Dates
2000-01-27—Published
1998-06-16—Filed