FIELD: oil production industry. SUBSTANCE: according to method, well is washed by solvent of asphalt-resin-paraffin depositions. Solvent is pressure-forced into bottom-hole zone of well and implosive treatment is performed. For treatment of bottom-hole zone, selected is well in area of deposit with lower bed pressure. Used in function of solvent for asphalt-resin-paraffin depositions is 3-6% solution in organic solvent of mixture of heavy pyrolysis resin and diproxamine in proportion of (9-11):1. Filling of well with solvent is carried out beginning from lower perforation holes up to well head. After that, first technological pause is made during 12-24 h. Pressure-forcing of solvent into bottom-hole zone is performed in amount 1.5-2.5 cub.m/m of perforation interval. Then, second technological pause is made during 12-24 h and solvent is replaced with plugging liquid. Thermo-implosive treatment is undertaken at implosive operation. At injectivity of well after filling it with solvent of asphalt-resin-paraffin depositions beginning from lower perforation holes up to well head, undertaken is pressure-forcing of solvent into bottom-hole zone in amount of 1.5-2.5 cub.m/m of perforation interval. Application of aforesaid method improves efficiency of treatment together with increased output from well. EFFECT: higher efficiency. 1 cl
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF ACTION ON FACE ZONE OF WELL | 2000 |
|
RU2159322C1 |
METHOD OF TREATMENT OF FACE ZONE OF WELL | 1999 |
|
RU2146003C1 |
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION, PRESSURE IMPULSE GENERATOR | 2007 |
|
RU2376455C2 |
METHOD FOR CONVERTING PRODUCING WELL INTO INJECTION WELL | 1999 |
|
RU2142047C1 |
WELL BOTTOM HOLE TREATMENT METHOD | 2002 |
|
RU2224089C1 |
METHOD OF SYNERGETIC REACTANT-IMPULSE-WAVE TREATMENT OF BOTTOM-HOLE FORMATION ZONE AND PLANT FOR ITS IMPLEMENTATION | 2010 |
|
RU2462586C2 |
METHOD OF TREATMENT OF BOTTOM-HOLE ZONE | 2000 |
|
RU2157885C1 |
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION | 2007 |
|
RU2376453C2 |
WELL BOTTOMHOLE ZONE TREATMENT METHOD FOR WASHING PARAFFIN ASPHALT AND TERRY MATTERS | 2017 |
|
RU2652236C1 |
METHOD OF COMPLEX ACTION ON FACE ZONE OF WELL | 2001 |
|
RU2184221C1 |
Authors
Dates
2000-03-10—Published
1999-08-09—Filed