FIELD: construction engineering; jointing columns to truss or slab and the like. SUBSTANCE: joint includes set of dowel pins formed by lines of relatively parallel pins whose central parts cross contact area of joint and whose end parts are consolidated by means of concrete mix in structural components joined together. Dowel pins are placed at least in one row in brush-like fastening arrangement; however within groups of several parallel rows of dowel pins joined together they are placed one on top of other. Set of dowel pins is concreted; some of them are fixed with concrete mix on contact area of supporting column capital; other projecting parts of dowel pins are fixed with concrete mix in ceiling structure, such as ceiling panel and/or ceiling truss. EFFECT: reduced labor consumption for transferring shear thrusts. 5 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REINFORCED COLUMN AND REINFORCED COLUMN HEAD RECOVERY | 2005 |
|
RU2308585C2 |
METHOD TO REINFORCE COLUMN AND JOINED ELEMENTS OF BUILDING SLAB | 2012 |
|
RU2498034C1 |
RECONSTRUCTED BUILDING AND METHOD FOR LOW-RISE BUILDING RECONSTRUCTION | 2015 |
|
RU2597901C1 |
UNIVERSAL HOUSE-BUILDING SYSTEM | 2014 |
|
RU2585330C2 |
METHOD FOR MANUFACTURING OF WALL-CEILING STRUCTURE IN REINFORCED CONCRETE VERSION | 2005 |
|
RU2368742C1 |
NODAL COUPLING OF PILLAR WITH MONOLITHIC SLAB | 2012 |
|
RU2547035C2 |
SKELETON OF MULTISTOREY EARTHQUAKE-PROOF BUILDING | 0 |
|
SU1390333A1 |
BUTT JOINT OF MONOLITHIC SLAB WITH COLUMN | 2008 |
|
RU2383692C1 |
COLLAPSIBLE-MONOLITHIC FRAMING OF BUILDING | 2011 |
|
RU2453662C1 |
MULTI-STORED BUILDING OF THE FRAME-WALL STRUCTURAL SYSTEM FROM PREFABRICATED AND MONOLITHIC REINFORCED CONCRETE | 2010 |
|
RU2441965C1 |
Authors
Dates
2001-03-10—Published
1996-03-26—Filed