FIELD: oil and gas producing industry, particularly, methods of treatment and demudding of bottomhole zones. SUBSTANCE: method consists in injection of solution of sodium naphthenate through tubing into flow string with its subsequent forcing into formation. Sodium naphthenate solution in service or formation water is prepared in ratio of 1:(0.5- 3) and injected into formation in amount of 0.4-5 cu.m per meter of formation thickness. Well is left to stand under pressure for 6-24 h. EFFECT: increased oil production rate.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FORMATION OF TEMPORARY BARRIER IN FILTER ZONE OF DEVELOPMENT WELL AND EQUALIZATION OF INJECTIVITY PROFILE OF INJECTION WELLS | 2000 |
|
RU2169261C1 |
CHEMICAL ADDITIVE FOR MEASURES TAKEN IN OPERATION OF OIL AND GAS WELLS | 2000 |
|
RU2174179C1 |
METHOD FOR RESTRICTING BOTTOM WATER AND ANNULUS BLOWOUTS IN PRODUCTION WELLS | 2000 |
|
RU2172825C1 |
METHOD FOR REAGENT CLAY CAKE REMOVAL FROM WELL | 2011 |
|
RU2484244C1 |
OIL RECOVERY ENHANCING COMPOSITION | 2004 |
|
RU2270229C1 |
SEALING COMPOSITION | 2004 |
|
RU2270227C1 |
METHOD FOR WELL BOTTOM ZONE TREATMENT | 2004 |
|
RU2270913C2 |
METHOD OF FORMATION REOPENING | 1999 |
|
RU2160827C1 |
METHOD OF WELL REAGENT DEMUDDING | 1999 |
|
RU2160831C2 |
PROCESS OF TREATMENT OF FACE ZONE OF WELL | 2001 |
|
RU2203409C1 |
Authors
Dates
2001-08-27—Published
2000-11-23—Filed