FIELD: construction engineering, particularly, construction and operation of structures on plate foundation located on nonuniformly compressed base. SUBSTANCE: novelty consists in that adaptation process and measuring channels are made in plate body, transducers are installed, ground physical and mechanical characteristics are controlled, consolidating and and packing solutions are injected by injection system to zones with low compaction of base, repeated compaction is performed to attain module of total deformation exceeding that in base of building end opposite to inclination occurred in process of its erection with attaining of stabilized settling of building after correction of base. EFFECT: uniform settling of entire foundation area during construction and in operation by adaptation of plate foundation to varying characteristics of ground base. 5 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS FIXING SLOPE OF SOIL FOUNDATION TRENCH | 2000 |
|
RU2196863C2 |
METHOD OF MONITORING GROUND BASE CHARACTERISTICS IN GROUND CONSOLIDATION | 2000 |
|
RU2193624C2 |
DRIVE INJECTOR | 2001 |
|
RU2208087C2 |
METHOD AND DEVICE FOR CAST-IN-PLACE PILE FORMING | 2002 |
|
RU2236506C2 |
DRIVE-IN INJECTOR | 2001 |
|
RU2206662C2 |
SOFT GROUND CONSOLIDATION METHOD | 2004 |
|
RU2278210C2 |
METHOD TO CORRECT IRREGULARITIES OF BUILDINGS AND STRUCTURES SUBSIDENCE ON SLAB FOUNDATION | 2011 |
|
RU2468152C1 |
METHOD OF MAKING CAST-IN-PLACE PILES WITH ROOT-LIKE MEMBERS AND DEVICE FOR ITS EMBODIMENT | 1998 |
|
RU2163279C2 |
METHOD FOR CORRECTION OF VERTICAL POSITION OF BUILDINGS AND STRUCTURES ON PANEL-WALL FOUNDATION | 2007 |
|
RU2352723C1 |
METHOD TO RECOVER CONTACT LAYER "FOUNDATION - SOIL BASE" | 2015 |
|
RU2572477C1 |
Authors
Dates
2002-07-10—Published
2000-06-14—Filed