FIELD: earth-moving machinery; power shovels with forced emptying of bucket. SUBSTANCE: bucket has rear and side walls hinge connected with dipper stick, bottom and movable clean-up frame hinge connected with side walls and bucket turning drive made in form of lever and tie-rods. Side walls of bucket and movable clean-up frame are connected with bucket dipper stick by means of one and the same hinge joint, and clean-up frame is furnished with turning drive made in form of hydraulic cylinder whose rod is hinge connected with clean-up frame. Housing is hinge-coupled with bucket turning drive lever, with longitudinal axes of hydraulic cylinder and tie- rods being located in one plane, and rear wall is provided with slot to pass clean-up frame drive hydraulic cylinder at turning of clean-up frame. EFFECT: enlarged operating capabilities, increased capacity. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
WORKING EQUIPMENT OF MECHANICAL SHOVEL | 1997 |
|
RU2121041C1 |
FRONT-END EQUIPMENT OF SINGLE-BUCKET HYDRAULIC EXCAVATOR | 2000 |
|
RU2186177C2 |
POWER SHOVER WORKING EQUIPMENT | 0 |
|
SU941477A1 |
EXCAVATOR BUCKET | 2019 |
|
RU2704669C1 |
WORKING EQUIPMENT AND CONVEYING UNIT | 0 |
|
SU1537765A1 |
EXCAVATOR BUCKET | 2022 |
|
RU2787228C1 |
WORKING EQUIPMENT FOR FLUID-OPERATED POWER SHOVEL | 0 |
|
SU1745823A1 |
EXCAVATOR BUCKET | 2016 |
|
RU2613399C1 |
WORKING EQUIPMENT OF SINGLE-BUCKET HYDRAULIC EXCAVATOR | 2008 |
|
RU2368734C1 |
MINE ROPE EXCAVATOR WORKING TOOLS | 2011 |
|
RU2488661C2 |
Authors
Dates
2002-08-10—Published
2000-12-04—Filed