FIELD: heat power engineering. SUBSTANCE: according to proposed method, main condensate of turbine is heated in low-pressure regenerative heaters and is delivered into high-pressure deaerator, additional feed water is deaerator in vacuum deaerator into which source water and heating agent delivered, source water is heated in water-to-water heater and steam from lower and upper heating extractions of turbine is delivered, respectively, into lower and upper line heaters to be used as heating medium. Condensate from lower line heater is used as heating medium in water-to-water heater of source water, and condensate from upper line heater is used as heating agent in vacuum deaerator. Cooled condensate from lower line heater is delivered into turbine main condensate pipeline after water-to-water heater before low-pressure heater first in direction of turbine main condensate flow. Deaerated additional feed water is delivered into turbine main condensate pipeline after low-pressure heater first in direction of turbine main condensate flow. EFFECT: increased economy, improved reliability of thermal power station. 3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214518C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214523C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214520C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214522C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2002 |
|
RU2211341C1 |
THERMAL POWER STATION | 2001 |
|
RU2214517C2 |
THERMAL POWER STATION | 2001 |
|
RU2214515C2 |
THERMAL POWER STATION | 2001 |
|
RU2214516C2 |
METHOD OF OPERATING THERMAL POWER STATION | 2000 |
|
RU2174181C1 |
THERMAL POWER STATION | 2001 |
|
RU2214519C2 |
Authors
Dates
2003-10-20—Published
2001-12-28—Filed