METHOD OF OPERATION OF WELL JET PLANT AT HYDRODYNAMIC BOTTOM HOLE ZONE TREATMENT Russian patent published in 2004 - IPC

Abstract RU 2222716 C1

FIELD: oil producing industry. SUBSTANCE: invention relates to pumping facilities designed for production of oil. According to proposed method, packer and jet pump with channels for admission of working agent and for pumped out formation fluid mounted on tubing string are lowered into well. Jet pump and packer are installed over top of productive stratum and packer releasing is carried out. Working agent is periodically delivered into jet pump nozzle. Delivery of working agent is provided at the following mode: first working agent is sharply delivered into nozzle of jet pump at preset pressure of pumping unit, differential pressure of productive stratum is built in 5-10 sec and said differential pressure is maintained from 2 to 20 min by constantly delivering working agent into jet pump nozzle at preset pressure of pumping unit, then repressing is built abruptly in 2-5 sec in form of water hammer by action of working agent from tubing string onto productive stratum owing to sharply changing over its delivery from tubing string through channel delivering pumped out formation fluid under-packer space. Water hammer is directed towards productive stratum leading to rear-off of particles in porous channels of productive stratum and forming micracks in bottom hole zone at working agent pressure on productive stratum exceeding formation pressure. Then entire working agent is sharply delivered into jet pump nozzle, and bottom hole zone treatment cycle by action of differential pressure and repressing is repeated. Number of "differential pressure - repressing" cycles is determined by degree of restoration of permeability of bottom hole zone revealed by checking production rates of well before and in process of cyclic action onto bottom hole zone. If output of well determined in two last checks has not increased, work is stopped. As a result, reliability and capacity are increased owing to restoration of permeability of bottom hole zone. EFFECT: increased yield of production and intake capacity of injection wells. 4 cl, 1 dwg

Similar patents RU2222716C1

Title Year Author Number
WELL JET PLANT FOR ALTERNATING HYDRODYNAMIC BOTTOM HOLE ZONE TREATMENT 2002
  • Khominets Zinovij Dmitrievich
RU2222717C1
METHOD OF OPERATION OF MINE JET PLANT AT HYDRODYNAMIC BED STIMULATION IN PROCESS OF BOTTOM HOLE ZONE TREATMENT 2002
  • Khominets Zinovij Dmitrievich
RU2221170C1
METHOD OF OPERATION OF WELL JET UNIT AT HYDRODYNAMIC STUDY OF WELLS 2002
  • Khominets Zinovij Dmitrievich
  • Shagiev R.G.
RU2208714C1
JET WELL PUMP INSTALLATION 2005
  • Khominets Zinovij Dmitrievich
RU2287723C1
WELL FLUID PLANT AND METHOD FOR OPERATION THEREOF 2005
  • Khominets Zinovij Dmitrievich
RU2289042C1
METHOD OF OPERATION OF WELL JET PLANT AT HYDRODYNAMIC TESTS OF WELLS 2004
  • Khominets Zinovij Dmitrievich
RU2260717C1
METHOD OF OPERATION OF WELL JET UNIT AT ACID FORMATION TREATMENT 2004
  • Khominets Zinovij Dmitrievich
  • Zabkevich Zbignev Adol'Fovich
RU2263235C1
METHOD OF OPERATION OF WELL JET PUMPING UNIT IN FORMATION PERFORATION 2002
  • Khominets Zinovij Dmitrievich
RU2213277C1
METHOD FOR BOREHOLE JET PLANT OPERATION DURING GAS PRODUCTION FROM GAS-CONDENSATE WELL 2004
  • Khominets Zinovij Dmitrievich
RU2263237C1
METHOD FOR WELL PLANT OPERATION DURING OPERATION OF WELLS AND THE PLANT FOR REALIZATION OF SAID METHOD 2003
  • Khominets Zinovij Dmitrievich
RU2248472C1

RU 2 222 716 C1

Authors

Khominets Zinovij Dmitrievich

Dates

2004-01-27Published

2002-12-16Filed