FIELD: technology for opening productive layers in operating and exploration wells. SUBSTANCE: method includes hydroabrasive perforation of operating column, concrete layer and layer rock, cleaning of well with technological fluid after previously said procedure with hydroabrasive perforation of operating column and concrete layer on quartz base. After hydroabrasive perforation of operating column and concrete layer local rifts are cleaned with fluid without abrasive. Then abrasive is supplied to the fluid of denseness of 4-7.8 grams on cubic centimeter and of rigidity of 5 to 9 units of Moos scale, together with powdered gas producing reagent in form of nifrite ammonium. EFFECT: heightened kinetic energy of abrasive materials particles during hydroperforation of layer rock while hydraulic resistance of hydroabrasive environment is lessened. 2 cl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ELIMINATING FREEZING AND CONTROL WELLS WHEN INSTALLING MINE SHAFTS USING HYDROJET TECHNOLOGY AND A SYSTEM FOR ITS IMPLEMENTATION | 2021 |
|
RU2770831C1 |
WELL HYDRAULIC-ABRASIVE PERFORATOR | 2003 |
|
RU2254452C1 |
METHOD OF RIMOSE HYDROSAND-BLAST PERFORATION | 2016 |
|
RU2645059C1 |
METHOD FOR SECONDARY PRODUCTIVE FORMATION EXPOSING BY SLOT HYDRAULIC JET PERFORATION AND WELL PUTTING IN OPERATION | 2005 |
|
RU2282714C1 |
METHOD AND DEVICE FOR SECONDARY FORMATION PENETRATION | 2004 |
|
RU2270331C2 |
METHODS OF ISOLATION OF THE PRODUCTIVE STRATA OVERLAPPED BY THE CASING STRINGS AND THE GROUTING MORTAR FOR ITS EXERCISE | 2005 |
|
RU2299230C2 |
METHOD FOR MAKING PERFORATION SLITS IN OPERATION COLUMN AND METHOD FOR OPENING BEDS | 2003 |
|
RU2256066C2 |
METHOD OF REPEATED PRODUCING FORMATION EXPOSING AND DEVICE FOR ITS IMPLEMENTATION | 2008 |
|
RU2365743C1 |
HYDRAULIC ABRASIVE JET PERFORATOR | 1994 |
|
RU2078911C1 |
METHOD OF ACID LONGITUDINAL HYDRAULIC FRACTURING OF LOW-PERMEABLE TERRIGENOUS COLLECTOR | 2014 |
|