FIELD: materials handling facilities; tower cranes.
SUBSTANCE: according to production plan, zones with different types of crane movement limits related to concrete objects are defined. Said zones are introduced into personal computer, not included into instrument complex of coordinate protection, under laboratory conditions. Using special software, array of data is formed in computer, each element of which corresponds to building site member and contains information of prohibited movement of crane in corresponding point. Said array is recorded in reprogrammable read-only memory of coordinate protection system which, basing on signals from transmitters, defining position of crane and its members and by signals from reprogrammable read-only memory forms drive locking signals if crane or its working members get into restricted zone.
EFFECT: provision of crane coordinate protection of high efficiency using simple devices.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
BOOM CRANE OVERLOAD SAFEGUARD | 1992 |
|
RU2045468C1 |
METHOD OF SETTING WORKING ZONE OF LOAD-LIFTING CRANE BY CRANE OPERATOR | 2004 |
|
RU2280610C2 |
METHOD TO INCREASE SAFETY OF OPERATION OF LOAD-LIFTING CRANE | 2004 |
|
RU2270162C2 |
SAFETY SYSTEM OF HOISTING CRANE | 2008 |
|
RU2381172C1 |
SYSTEM TO PREVENT COLLISION OF HOISTING CRANES | 2009 |
|
RU2398728C1 |
METHOD TO RULE WEIGHT SWINGING ON FLEXIBLE SUSPENSION (VERSIONS) | 2009 |
|
RU2406679C2 |
METHOD OF IMPROVEMENT OF SAFETY OF WORK OF ERECTING CRANE (VERSIONS) | 2007 |
|
RU2345944C1 |
METHOD OF MEASURING BEARING ANGLE OF HOISTING CRANE AND DEVICE TO THIS END | 2007 |
|
RU2344370C1 |
DEVICE TO CONTROL CONSTRUCTION MACHINE (VERSIONS) | 2009 |
|
RU2399576C1 |
LOAD-LIFTING CRANE SAFETY DEVICE WITH GRAPHIC DISPLAY (VERSIONS) | 2006 |
|
RU2326806C1 |
Authors
Dates
2005-02-20—Published
2002-07-31—Filed