FIELD: mining industry.
SUBSTANCE: wall has caved-in rock, being in passage with cuts and fully closing the latter, which is formed by prior driving of a fan of coupled ascending drifts, loading charges therein and detonating the latter in order from ends of fan to its center. In rock before wall two mated side horizontal dead-end tunnels are made at sharp angles ±40÷60° to direction of air strike waves and with cross-section area, equal to area of main passage cross-section, and with length 5÷15 of dimensions of passage width. On the side of approach of air strike wave angles of mating surfaces of protected passage and dead-end tunnels are made rounded. After protection from air strike wave and providing for possible crossing of passage rock of wall is stored in horizontal dead-end tunnels.
EFFECT: higher efficiency, lower costs.
2 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
TEMPORARY PROTECTIVE ROCK WEB | 2019 |
|
RU2726823C1 |
METHOD FOR PROTECTION FROM AIR-BLAST BY TEMPORARY ROCK WALL | 2003 |
|
RU2236598C1 |
HEAT WAVES SUPPRESSION MULTIPLE ACTION DEVICE | 2004 |
|
RU2249113C1 |
METHOD FOR ERECTING MUCK DIKE | 0 |
|
SU977780A1 |
METHOD FOR SEALING OFF MINE WORKINGS | 0 |
|
SU1634784A1 |
METHOD FOR WORKING ORE BODIES | 0 |
|
SU1684497A1 |
METHOD OF FORMATION OF CUTTING HOLLOW AT SINKING OF MINING WORKINGS | 1991 |
|
RU2068958C1 |
TUNNEL CONSTRUCTION METHOD | 0 |
|
SU1550157A1 |
METHOD TO CARRY OUT BLASTING IN MINES WITH HAZARDOUS OIL AND GAS CONTENT | 2010 |
|
RU2439485C2 |
METHOD FOR DEVELOPMENT OF THICK STEEP-DIPPING COAL SEAMS | 1998 |
|
RU2138639C1 |
Authors
Dates
2005-03-27—Published
2004-01-22—Filed