FIELD: oil producing industry; pumping facilities.
SUBSTANCE: proposed well jet plant contains packer and jet pump installed on tubing. Pump is provided with nozzle and mixing chamber with diffuser installed in housing, and stepped through channel is made. Possibility is provided for fitting functional inserts in through channel, for instance, for recording formation pressure built-up curves, and self-contained logging complex is installed on tubing lower than packer for checking physical values, for instance, specific electric resistance of rocks. Jet pump is arranged in casing over producing formation of well. Ring is arranged on tubing lower than packer to center packer in casing. Packer is made of elastic material in form of open-top cup with cone-shaped side wall. Bottom of cup is hermetically secured on tubing, and packer, in its position before removing, has the following dimensions: maximum outer diameter of packer side wall D2 is 0.75-0.99 of inner diameter D1 of casing; length L of packer is from 0.5 to 3 diameters D4 of packer cup bottom; maximum inner diameter D3 of side wall of packer cup is 0.6-0.96 of maximum outer diameter D2of packer cup; and outer diameter D5 of centering ring is 0.8-1.05 of diameter D4 of packer cup bottom.
EFFECT: intensification of surveying and testing of walls with open and cased holes, mainly crooked and horizontal holes, optimization of sizes of packer operating together with jet pump and self-contained logging complex, improved reliability of well jet plant.
2 cl, 1 dwg
Authors
Dates
2005-05-20—Published
2004-02-02—Filed