FIELD: heat power engineering.
SUBSTANCE: boiler plant comprises chimney with air passage between the reinforced concrete shaft and lining, which define gas discharging passage, air heater mounted under the gas discharging passage, and fan for supplying heated air to the air passage in the chimney. The air passage is separated by two vertical baffles into two sections. The pipe is provided with a box for discharging the heated air from one section of the air passage to the other.
EFFECT: enhanced efficiency.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
BOILING PLANT | 2006 |
|
RU2299377C1 |
BOILER PLANT | 2006 |
|
RU2303198C1 |
BOILER PLANT | 2006 |
|
RU2305225C1 |
CHIMNEY OPERATION METHOD | 2004 |
|
RU2254428C1 |
BOILER PLANT | 2009 |
|
RU2415336C1 |
AIR HEATING SYSTEM | 2010 |
|
RU2457018C2 |
OFF GAS HEATING SYSTEM | 2010 |
|
RU2457891C2 |
SYSTEM TO HEAT WASTE GAS AND AIR MEDIUM | 2011 |
|
RU2477821C1 |
METHOD AND DEVICE FOR REMOVING GAS FROM HEAT POWER STATION | 1992 |
|
RU2051316C1 |
BOILER HOUSE | 2022 |
|
RU2815593C2 |
Authors
Dates
2005-07-27—Published
2003-12-29—Filed