FIELD: oil production industry, particularly to supply chemical reagents into well or pipeline.
SUBSTANCE: method involves connecting pressure source, namely gas, and chemical reagent vessel with object to be treated; injecting chemical reagent into the object without shutdown thereof or performing technological pause and bringing the object into operation. Hole annuity or land-based pipeline are used as the object to be treated. Pressure source is hole annuity of production well. Gas is accumulated in above hole annuity by closing gate valve of wellhead fittings, which result in pressure increase up to value exceeding that in well to be treated or in pipeline for not less than 0.2 MPa.
EFFECT: increased efficiency of chemical reagent injection into object to be treated.
2 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS AND GEAR FOR DEVELOPMENT AND CLEARING OF FACE ZONE OF WELLS BY PULSE DRAINAGE | 1999 |
|
RU2159326C1 |
MOBILE CHEMICAL PLANT FOR SUPPLY OF CHEMICALS FOR TREATMENT OF OIL-GAS PRODUCTION WELLS AND PIPELINES | 2010 |
|
RU2456435C2 |
METHOD AND DEVICE FOR CLEARING WELLS FROM PARAFFIN-RESIN DEPOSITS | 1994 |
|
RU2085706C1 |
METHOD FOR CLEANING BOTTOMHOLE FORMATION ZONE AND PLANT FOR IMPLEMENTATION THEREOF | 2009 |
|
RU2396420C1 |
WELL INHIBITION METHOD | 2019 |
|
RU2728015C1 |
METHOD OF CLEANING BOTTOM-HOLE FORMATION ZONE OF INJECTION WELLS AFTER HYDRAULIC FRACTURING | 2015 |
|
RU2601879C1 |
PROCESS OF BOTTOM-HOLE TREATMENT | 2002 |
|
RU2222697C1 |
PRODUCTION BED TREATMENT METHOD | 2004 |
|
RU2258803C1 |
COMPOUND METHOD FOR OIL DISPLACEMENT OUT OF BED BY WATER-ALTERNATED-GAS INJECTION WITH USE OF WELL-HEAD EJECTORS | 2012 |
|
RU2512150C2 |
TREATMENT AND CLEANUP METHOD OF BOTTOM-HOLE ZONE, AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2555718C1 |
Authors
Dates
2005-11-20—Published
2004-01-22—Filed