FIELD: geotechnological mining operations, particularly oil production by rock permeability reduction and reservoir coverage increase.
SUBSTANCE: method involves determining oil reservoir pore dimensions Dp before displacement agent injection; injecting water and rubber crumb through injection well and producing product through production well; injecting water and car tire crumb after full oil reservoir flooding. Car tire crumb dimension Dcr is more or equal to 1.3 Dp. Water and crumb ratio is 1:0.3 - 1:0.1, wherein above ratio at the initial stage exceeds that at the final stage of oil reservoir development.
EFFECT: increased depth of reservoir treatment and reduced reagent cost along with possibility to utilize used polymeric car tires.
1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PRODUCING OIL IN POROUS FRACTURED RESERVOIRS REDUCING WELL PRODUCT WATER CONTENT | 2011 |
|
RU2465446C1 |
METHOD FOR DEVELOPMENT OF MULTI-BED OIL DEPOSITS | 1996 |
|
RU2113590C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1993 |
|
RU2085710C1 |
METHOD FOR DEVELOPMENT OF MULTIPLE-BED OIL DEPOSITS | 1995 |
|
RU2105869C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1995 |
|
RU2085714C1 |
OIL STRATUM WATERING METHOD | 1992 |
|
RU2072422C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS | 1997 |
|
RU2127802C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2009 |
|
RU2498056C2 |
DEVELOPMENT METHOD OF NON-HOMOGENEOUS OIL DEPOSIT | 2011 |
|
RU2471971C1 |
METHOD OF INCREASING OIL RECOVERY OF FORMATIONS | 2024 |
|
RU2820950C1 |
Authors
Dates
2006-01-10—Published
2004-03-25—Filed