FIELD: building, particularly working measures on existing buildings.
SUBSTANCE: method involves initially building up connection seams at ends of members to be reinforced within the limits of corner plates; building up intermediate seams in several sections; building up additional seams crossing above seams and arranged at paired flanges of main rod angle-bars. Dimensions of each additional seam are selected to provide flexure equal to flexure of each intermediate built-up seam. This provides sinusoidal rod flexure change with amplitude range of not more than ±0.5 m.
EFFECT: possibility to perform reinforcement operations at all stressed in centrally compressed rods, increased load-bearing capacity of the rods.
5 dwg
Title | Year | Author | Number |
---|---|---|---|
REINFORCING METHOD FOR CENTRALLY COMPRESSED RODS OF ANGLE-STEEL COVERING TRUSSES | 2002 |
|
RU2275483C2 |
REINFORCEMENT METHOD FOR COMPRESSED MEMBERS | 2005 |
|
RU2308584C2 |
METHOD OF REPARING CRANE GIRDERS | 0 |
|
SU1333522A1 |
MAKING BUTT WELD JOINT BETWEEN REINFORCING BARS | 2012 |
|
RU2520285C1 |
DEVICE FOR COMPRESSED MEMBER RECOVERY | 2005 |
|
RU2308583C2 |
ANCHORING DEVICE FOR STRESSED REINFORCEMENT STRUTS FIXATION | 2005 |
|
RU2308582C2 |
METHOD OF INCREASING SERVICE RELIABILITY OF METALLIC TRUSSES | 0 |
|
SU1021738A1 |
METHOD FOR PRESTRESSED REINFORCEMENT CROSS-PIECE ANCHORING | 2005 |
|
RU2315158C2 |
METHOD TO REINFORCE PILLAR AND SUSPENDED WALL PANELS | 2011 |
|
RU2486323C1 |
METHOD FOR REINFORCING A REINFORCED CONCRETE TRUSS | 2022 |
|
RU2782773C1 |
Authors
Dates
2006-06-27—Published
2002-09-24—Filed