FIELD: methods or apparatus for obtaining oil, gas or other materials from wells, particularly devices for submersed pump installation in water injection bore, which supplies water to well in reservoir pressure maintenance system.
SUBSTANCE: device comprises intermediate column installed in bore and provided with electric-centrifugal pump to supply water in one or several wells. Intermediate column is air-tight and may provide bore casing pipe filling with oil. Intermediate column additionally has inner sectional pipe, which is adapted to suspend electric-centrifugal pump below ground freezing and demounting level. Sectional pipe end is provided with teeth and spider-like partition having inclined blades.
EFFECT: extended capabilities of standard pump usage, improved bore casing pipe protection against corrosion, provision of additional electric drive cooling, simplified pump removal from bore for pump repair.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BOREHOLE TRANSFER AND UNIT FOR TRANSFER OF LIQUID FROM UPPER WELL FORMATION TO LOWER ONE WITH FILTRATION | 2011 |
|
RU2485293C1 |
METHOD OF OIL FORMATION DEVELOPMENT | 2016 |
|
RU2622418C1 |
INSTALLATION FOR PUMPING FLUID INTO THE FORMATION | 2015 |
|
RU2608096C1 |
METHOD FOR INTER-WELL TRANSIT OF LIQUID | 2005 |
|
RU2290500C1 |
SYSTEM FOR PUMPING DISPLACEMENT AGENT INTO PRESSURE WELLS | 2009 |
|
RU2397318C1 |
INSTALLATION TO PUMP FLUID INTO POOL | 1999 |
|
RU2163661C2 |
METHOD OF INJECTION OF WATER IN THE SYSTEM OF SUPPORTING THE RESERVOIR PRESSURE IN WEAKLY PERMEABLE HEADERS | 2018 |
|
RU2676780C1 |
WELL OPERATION INSTALLATION | 2013 |
|
RU2531228C1 |
METHOD FOR REGULATING THE OPERATING MODE OF A WELL EQUIPPED WITH AN ELECTRIC CENTER PUMP INSTALLATION IN AN INTER-WELL PUMPING SYSTEM | 2021 |
|
RU2758326C1 |
DEVICE FOR LIQUID INJECTION IN ONE WELL RESERVOIR AND OIL PRODUCTION FROM ANOTHER ONE | 2006 |
|
RU2323329C1 |
Authors
Dates
2006-06-27—Published
2004-06-18—Filed