FIELD: oil industry.
SUBSTANCE: method comprises assembling pipe column and running the assembly into the well. The packer is set above the roof of the intermediate bed. The sealing unit is set in the step through passage of the jet pump. The logging instrument is run with the use of the logging rope passing through the sealing unit and is set in the zone of productive bed. During the run, the background values of physical fields of the rock along the well are recorded. .
EFFECT: enhanced efficiency and reliability.
2 cl, 3 dwg
Authors
Dates
2006-07-27—Published
2005-07-04—Filed