FIELD: atomic power engineering.
SUBSTANCE: according to proposed method of checking of fuel elements, in process of manufacture of jacket of fuel element, plug is preliminarily marked, number is read off, jacket is weighed and data are entered into computer and after charging of jacket with nuclear, number is read off, filled jacket is weighed, net weight of nuclear fuel is determined and data are entered into computer. After sealing and checking, number is read off and entered into computer and before assembling of fuel element, number is read off and data are entered into computer.
EFFECT: possibility of tracing fuel elements along technological flow from moment of manufacture to assembling into fuel element cluster, revealing and isolating fuel elements which do not comply with requirements at exclusion of distortion of temperature and neutron fields in nuclear reactor.
5 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS LINE FOR FUEL ROD MANUFACTURE AND NUCLEAR POWER REACTOR FUEL ROD | 2001 |
|
RU2216797C2 |
AUTOMATIC DEVICE FOR MARKING FUEL ELEMENT PLUGS | 1999 |
|
RU2228551C2 |
AUTOMATIC MANUFACTURING LINE OF FUEL ELEMENTS OF NUCLEAR REACTOR | 2010 |
|
RU2459292C1 |
PROCESS LINE FOR MANUFACTURING FUEL ASSEMBLIES | 2002 |
|
RU2231835C2 |
METHOD FOR MANUFACTURING FUEL ELEMENTS AND FUEL ASSEMBLIES | 2002 |
|
RU2228550C2 |
PROCESS OF MANUFACTURING OF FUEL ELEMENTS IN NUCLEAR REACTOR | 2008 |
|
RU2397557C2 |
METHOD FOR INSPECTING AND GRADING FUEL ELEMENTS | 2002 |
|
RU2236051C2 |
PROCESS LINE FOR FUEL ELEMENT MANUFACTURE | 2003 |
|
RU2256250C2 |
PROCESS LINE FOR MANUFACTURING FUEL ELEMENTS | 2002 |
|
RU2248054C2 |
FUEL ELEMENT INSPECTION AND REJECTION UNIT | 1999 |
|
RU2155394C1 |
Authors
Dates
2006-11-20—Published
2003-10-28—Filed