FIELD: rolled tube production, namely piercing sleeves of ingots having shrink holes and of drilled blanks of steel kinds with trend to occurring in back ends of sleeves so called "triangles", possibly manufacture of tubes in tube rolling plants with pilger mills.
SUBSTANCE: method comprises steps of deforming ingots and blanks on mandrel by means of working rolls, idle rollers and liners; moving axes of rollers in horizontal plane towards sleeve rotation beginning from time moment of mandrel approaching to shrink hole and load growing of mill drive. Deformation of ingots and blanks is realized in pass formed by working rolls, idle rollers or liners. Axes of rollers or liners are arranged stationary at shifting them in horizontal plane relative to piercing axis to side of sleeve rotation while in vertical plane shifting to piercing axis for rollers and from piercing axis for liners. Axes of idle rollers are shifted in horizontal plane relative to piercing axis to side of sleeve rotation by value L and in vertical plane to piercing axis by value Li. L = KDr + Ds/Ss; Li = K1 Dr +Ds/Ss, where Dr - diameter of idle roller on constricted portion, mm; Ds - outer diameter of sleeve, mm; Ss - sleeve wall thickness, mm; K = (0.2 - 0.3) - factor taking into account geometry size of sleeves for determining shifting value of idle roller axes in horizontal plane; K1 = (0.02 - 0.03) - factor taking into account geometry size of sleeves for determining value of shifting axes of idle rollers in vertical plane. Shifting value of liners axes in horizontal plane relative to piercing axis L2 = Ds/Ss and in vertical plane their shifting from piercing axis L3 = K2 x Ds/Ss, where K2 = (0.5 -1.0) - factor taking into account geometry size of sleeves for determining shifting value of liner axes in vertical plane. Large values of factors K, K1, K2 are set for sleeves with high relation Ds/Ss. Invention provides lowered metal consumption at rolling tubes in tube rolling plants with pilger mill from ingots with diameters 550 mm and more and from drilled blanks with diameter 600 mm and more.
EFFECT: improved quality of sleeves due to lowered number or complete elimination of "triangles" in end portions of thin-wall sleeves.
3 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PIERCING OF INGOTS AND BILLETS WEIGHING FROM 3 TO 10 TONS TO SLEEVES AT HELICAL ROLLING MILL | 2012 |
|
RU2523402C1 |
METHOD FOR PRODUCING IN TUBE ROLLING PLANTS WITH PILGER MILLS SEAMLESS HOT-DEFORMED ELONGATED TUBES FOR STEAM BOILERS, STEAM CONDUITS AND MANIFOLDS OF PLANTS WITH HIGH AND SUPER-CRITICAL PARAMETERS OF STEAM | 2006 |
|
RU2322315C2 |
TITANIUM BASE ALLOY INGOTS AND BILLETS PIERCING METHOD FOR MAKING SLEEVES IN SKEW ROLLING MILLS | 2005 |
|
RU2296019C1 |
METHOD FOR PRODUCING IN TUBE ROLLING PLANTS WITH PILGER MILLS SEAMLESS HOT-DEFORMED LARGE- AND MEAN-DIAMETER TUBES FOR STEAM BOILERS, STEAM PIPES AND COLLECTORS OF PLANTS WITH HIGH AND SUPER-CRITICAL PARAMETERS OF STEAM FROM INGOTS OF ELECTROSLAG REFINING AND CONTINUOUSLY CAST BILLETS | 2005 |
|
RU2297891C2 |
METHOD OF CONVERSION PIPE MANUFACTURING IN PIPE ROLLING PLANTS WITH PILGER MILLS OF LOW-ELASTICITY STEEL WITH BORON CONTENT OF 1,3-1,8% | 2006 |
|
RU2334571C2 |
METHOD FOR PREPARING FORGED AND CONTINUOUSLY CAST BILLETS, ELECTROSLAG REFINING INGOTS, HOLLOW-SLEEVE-BLANKS OF ELECTROSLAG REFINING FOR ROLLING BOILER TUBES AND PREPARING HOLLOW SLEEVE-BLANKS OF HARD-TO-FORM STEELS AND ALLOYS FOR ROLLING COMMERCIAL AND CONVERSION TUBES | 2005 |
|
RU2306993C2 |
CROSS-SCREW-ROLLING MILL PROCESS TOOL FOR PIERCING-ROLLING-OFF OF LARGE-DIAMETER ELECTROSLAG-REMELTING SLEEVE BLANKS AND HOLLOW INGOTS FROM ALLOYED HARDLY-DEFORMED GRADES OF STEEL AND ALLOYS | 2012 |
|
RU2527582C2 |
METHOD FOR PRODUCING BY ELECTROLAG REFINING INGOT-BLANKS OF HARD-TO-FORM STEELS AND ALLOYS AND FOR ROLLING OF THEM COMMERCIAL TUBES OF LARGE AND MEAN DIAMETERS IN TUBE ROLLING PLANTS WITH PILGER MILLS AND CONVERSION TUBES FOR FURTHER REROLLING IN TUBE COLD ROLLING MILLS | 2006 |
|
RU2322317C2 |
MANUFACTURING METHOD OF SEAMLESS HOT-DEFORMED PIPES OF LARGE AND MEAN DIAMETERS ON PIPE ROLLING UNITS WITH PILGER MILLS FROM CONTINUOUSLY CAST BILLETS | 2013 |
|
RU2545962C2 |
METHOD FOR PRODUCING IN TUBE ROLLING PLANTS WITH PILGER MILLS SEAMLESS HOT DEFORMED LARGE- AND MEAN-DIAMETER TUBES FOR STEAM BOILERS, STEAM PIPES AND COLLECTORS OF PLANTS WITH HIGH AND SUPERCRITICAL PARAMETERS OF STEAM | 2005 |
|
RU2297892C2 |
Authors
Dates
2006-11-27—Published
2004-10-06—Filed