FIELD: oil and gas production industry, particularly perforators and permeators.
SUBSTANCE: method involves creating micro-fissure system in productive reservoir; penetrating reservoir for screen forming and stimulating reservoir product influx. For screen forming reservoir is penetrated by drilling thereof or by hydraulic monitor or by abrasive method or by removing chemically-damaged cups from orifices of casing pipe screen included in casing pipe. Screen orifices are arranged in staggered order and formed along screw line. Micro-fissure system is created after reservoir exposing and stable reservoir fluid influx with the use explosive perforator.
EFFECT: increased productive well capabilities.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PRODUCTIVE RESERVOIR OPENING | 2018 |
|
RU2723813C2 |
METHOD OF FORMATION EXPOSING IN CASED HOLE | 2006 |
|
RU2332561C2 |
METHOD OF STABILISATION OF PRODUCING FORMATION WITH UNSTABLE ROCKS | 2011 |
|
RU2464410C1 |
WELL CONSTRUCTION METHOD | 2019 |
|
RU2720721C1 |
METHOD OF SECONDARY EXPOSING FOR OIL AND GAS PRODUCING FORMATIONS | 2007 |
|
RU2349737C1 |
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL BOREHOLE OF WELL | 2019 |
|
RU2708747C1 |
METHOD OF PUTTING INTO OPERATION OF PRODUCTIVE RESERVOIRS IN WELLS AT THE LATE STAGE OF DEVELOPMENT | 2013 |
|
RU2559985C2 |
WELL COMPLETION METHOD | 2023 |
|
RU2795281C1 |
RECOVERY METHOD FOR NATURAL RESERVOIR PERFORMANCE DETERIORATED DURING WELL CONSTRUCTION | 2012 |
|
RU2534171C2 |
GRAVITY-INERTIA FILTER FOR INSTALLATION OF ELECTRICALLY DRIVEN CENTRIFUGAL PUMP | 2019 |
|
RU2718445C1 |
Authors
Dates
2007-10-10—Published
2005-09-22—Filed